G'day all
I'm starting this thread to see if there are other members in the 'same boar' as me.
I have to stop my Royal Caroline build for a while...... may be 3 months and this is the reason.......
.......
Sounds good, hey. But my wife said that we should paint the lounge room first and change the carpet to floating timber floor, and then, we can do our bedroom, as its needs painting (but I can't see that) and also she wants the carpet to change to the timber floor as well.
There goes my hobby time for a month, but then....
.....you know how one job leads to another, well you guessed it. Because the skirting boards around the whole house is tiny and only 8mm wide and 25 high, I have to change the skirting boards in the lounge and bedrooms to new 19mm wide and 62 high. But and this is a big but, all the skirtings flow through out the whole living areas of the house, so I have to change and replace all the skirting for the living areas and the door and windows frames.
The total amount of timber required required for this job is 287 meters. Then it has to painted. And we got 85 square meters of flooring. There maybe enough flooding to do our computer room, we see, and more work!
My wife says that she will paint the rooms, if I do the skirtings etc. We will both do the floors, Luz will be my labourer.
So it looks like my next 2 or 3 months has been planned out for me.
I hope that you all will have a very merry Christmas or whatever holidays you follow.
Happymodeling to you all and please think of me....... slaving away.PoopPoopPoop
Greg
I'm starting this thread to see if there are other members in the 'same boar' as me.
I have to stop my Royal Caroline build for a while...... may be 3 months and this is the reason.......
.......
BUMMER BUMMER BUMMER!
We just bought for our 3 lounge room' windows 3 plantation shutters.Sounds good, hey. But my wife said that we should paint the lounge room first and change the carpet to floating timber floor, and then, we can do our bedroom, as its needs painting (but I can't see that) and also she wants the carpet to change to the timber floor as well.
There goes my hobby time for a month, but then....
.....you know how one job leads to another, well you guessed it. Because the skirting boards around the whole house is tiny and only 8mm wide and 25 high, I have to change the skirting boards in the lounge and bedrooms to new 19mm wide and 62 high. But and this is a big but, all the skirtings flow through out the whole living areas of the house, so I have to change and replace all the skirting for the living areas and the door and windows frames.
The total amount of timber required required for this job is 287 meters. Then it has to painted. And we got 85 square meters of flooring. There maybe enough flooding to do our computer room, we see, and more work!
My wife says that she will paint the rooms, if I do the skirtings etc. We will both do the floors, Luz will be my labourer.
So it looks like my next 2 or 3 months has been planned out for me.
So no more shipwright work for me until that is all done.
Boo hoo.I hope that you all will have a very merry Christmas or whatever holidays you follow.
Happymodeling to you all and please think of me....... slaving away.PoopPoopPoop
Greg