I'm attaching my 1/50 running rigging, and at the moment I am passing the thread through the hole in the pin rail then clamping it in place with the belaying pin with the plan to put coils on later. Once I've finalised the position of the ropes, should I glue them to the pinrail? Does the belaying pin tend to pop out after a while?