Page 15 |
THE MAST, DECK BLOCK PULLIES, and DEADEYES |
THE RIGGING: STANDING and RUNNING |
|
|
VIII. RIGGING THE FOREMAST SHROUDS (cont.)
|
 |
|
February 25, 2012 |
EDIT: Before reading, take note that I REMOVED the Futtock Stave and Futtock Staves again. I apologize as it is just due to
taking note that the leading Futtock Shroud was going to interferre greatly with the Yard in place. So therefore, I had to '
mockup a yard and install it as a temporary fix so that I can determine the placement of that first Futtock. The images on the next date
of February 2/26/2012 will finally show the result of all these changes. I beleive that I am happy with the results.
The images below are NOT applicable - I only keep these online so that you will see the mistake and problems.
|
 |
Rigging Foremast Futtock Shrouds 29 |
 |
Rigging Foremast Futtock Shrouds 30 |
|
|
 |
|
February 26, 2012 |
It was good that I decided to remove all the previous work. I almost forgot that I had to do the Ratlines for the Futtock Shrouds.
From the Photo, you will see that I mocked up a Yard so that I can determine the proper placement of the leading Futtock Shroud this time.
I realize that most will say that the angles are wrong, but I am going by the plans. The other ships have the Top shifted more to the rear which
will make the Futtocks fall somewhat striaight down, but on this ship, (I guess due to spanish design or manufacture design), I see that
I would have to part way from the original manufactures drawings to so so like other ships, for instance English or otherwise.
 |
Rigging Foremast Futtock Shrouds 30 |
 |
Rigging Foremast Futtock Shrouds 31 |
|
|
 |
|
February 26, 2012 |
The latest as working on the Shrouds. I will be stopping at this point on this side and moving to work on the other side
next time.
 |
Rigging Foremast Futtock Shrouds 32 |
|
|
 |
|
March 3, 2012 |
The latest as working on the Shrouds.
 |
Rigging Foremast Futtock Shrouds 33 |
 |
Rigging Foremast Futtock Shrouds 34 |
 |
Rigging Foremast Futtock Shrouds 35 |
 |
Rigging Foremast Futtock Shrouds 36 |
 |
Rigging Foremast Futtock Shrouds 37 |
 |
Rigging Foremast Futtock Shrouds 38 |
 |
Rigging Foremast Futtock Shrouds 39 |
 |
Rigging Foremast Futtock Shrouds 40 |
|
|
 |
|
March 8, 2012 |
The latest as working on the Shrouds. These images are of the single shroud needed.
 |
Rigging Upper Foremast Shrouds 1 |
 |
Rigging Upper Foremast Shrouds 2 |
 |
Rigging Upper Foremast Shrouds 3 |
 |
Rigging Upper Foremast Shrouds 4 |
|
|
 |
|
March 10, 2012 |
The latest as working on the Shrouds. The Deadeye on the left is not correct spacing. So I left it there as a guide to
adjust the spacing correction of the one on the right. Now that I am satisfied with it, I will dismantle the one on the left.
 |
Rigging Upper Foremast Shrouds 5 |
|
|
 |
|
March 16, 2012 |
The latest as working on the Shrouds. I made big mistake in the fact that my upper shrouds were looped around the
wrong mast head section. So, I pulled those and re rigged them. The photos below show the accurate method.
 |
Rigging Upper Foremast Shrouds 6 |
 |
Rigging Upper Foremast Shrouds 7 |
 |
Rigging Upper Foremast Shrouds 8 |
 |
Rigging Upper Foremast Shrouds 9 |
|
|
 |
|
March 24, 2012 |
 |
Rigging Upper Foremast Shrouds 10 |
|
|
 |
|
March 24, 2012 |
Welcome back friends. I know it has been a while since I posted and I know that there are friends eager to see what is going on.
So, without much to say, I decided to rig up my Ratlines.
 |
Rigging Upper Foremast Shrouds 10 |
|
|
 |
|
April 9, 2012 |
 |
Rigging Upper Foremast Shrouds 11 |
|
|
 |
|
April 16, 2012 |
 |
Rigging Upper Foremast Ratlines 12 |
 |
Rigging Upper Foremast Ratlines 13 |
|
|
 |
|
May 16, 2012 |
Not much to say - just starting on the Mizzen Mast Shrouds. You might notice the seizing on the fore-shroud. This protects the shroud from sail wear on that line.
 |